TDOT sends phase 2 design plan of 1-40 bridge to contractor


MEMPHIS, Tenn. (WMC) – Work on the I-40 bridge continues.

The bridge has been shut down for almost six weeks.

Monday, the Tennessee Division of Transportation (TDOT) posted a video of crews reducing the part one plate that was put in. All through this week, inspections, weld testing, and routine upkeep will go on.

Design plans for part two got to the contractor over the weekend. The subsequent step might be to get the plates, bolts, and different supplies for part two

TDOT expects to launch extra info on that timeline later this week.

Copyright 2021 WMC. All rights reserved.





Source link

Related Posts

Next Post

Leave a Reply

Your email address will not be published. Required fields are marked *

Premium Content

Are you sure want to unlock this post?
Unlock left : 0
Are you sure want to cancel subscription?
superbahis safirbet polobet maltcasino interbahis grandbetting dinamobet celtabet aresbet asyabahis betnano casinomaxi casinometropol galabet jojobet marsbahis mroyun perabet imajbet betmarino verabet holiganbet meritroyalbet trendbet artemisbet vdcasino